A USACE funded project to automate Mississippi river revetment, a currently 300+ person highly manual operation. The final system will autonomously lay tied together concrete mats to prevent river erosion, representing a significant risk reduction and throughput increase of the current process.

Video of current process: https://www.youtube.com/watch?v=dLaEksC-Dtg

Video of Automation Project Overview: https://www.youtube.com/watch?v=KuKYNeUMO5w&t=265s

Barge Launch Sep. 2025: https://www.facebook.com/watch/?v=1085069493358595

My Contributions

  • Barge Deck System - Lead Mechanical Designer

    • Developed hydraulic cut and clamp launch cable system with line tensions up to 20,000 lbs.

    • Servo driven chain linked twheel system to positions squares ±0.125” for tying & coordinate motion for parallel launch + tie operations

    • Scale prototype built on-site for testing and operator training comprised of 4 rows

  • Manual Tie Tool - Lead

    • Managed 4-person cross disciplinary team to developed the software, electrical, and mechanical systems

    • Multiple on-site testing visits culminating in 9 currently deployed units

  • Lifting Frame Redesign - Mechanical Designer

    • Came up with new concept to align while landing v. land then align which eliminated the need for overly complex and underperforming “fork truck” style prior system design

    • Created pneumatically actuated hook system analyzed with SW FEA and tested to withstand 2g acceleration loads with a 4 point grab on over 7,000 lbs. of concrete (2x square grab