Logger (by necessity (with no formal training))

Some people see a 75 ft. oak on their fence with the back of their shed roof missing as a bad day. But I saw it as the start of what would be a year(s) long adventure.

After clearing the debris and fixing the fence + shed it was time for the real work to begin. My foray into alaskan milling. Pro tips: wear a back brace and yes the saw really does cut that slow when ripping.

Previous
Previous

Woodworking